GENCO Building Services
  Services
 

Professional Services for Professional Builders

The GENCO Inspection Manager is an online tool designed and created expressly for our builders and developers. Each aspect of Inspection manager has been carefully planned to provide you with the most efficient ways to manage the services we provide to your and your company. Inspection Manager offers many features that will increase efficiency and provide a real-time method of communications to keep you completely informed about your scheduled and completed inspections.

Below is a list of your current inspections. Click on any of the hot links in a respective inspection to view its status and details.

We hope you find Inspection Manager to be a valuable tool and will continue to work towards providing you with industry leading processes and technology that will meet and exceed your expectations.

A-B-C-D-E-F-G-H-I-J-K-L-M-N-O-P-Q-R-S-T-U-V-W-X-Y-Z
Brick Flashing
Buried Cables
Ceiling Diaphragm
Columns and Beams
Complete Rough
Cover Up
Deep Foundation
Demolition Final
Dry IN
Drywall Fastening
Early Power Residential Only
Electrical – Rough In
Electrical – TUG/Early Power
Electrical Final
Electrical Service Change Out
Electrical Slab
Electrical Slab Rough
Electrical Underground
Elevated Flatwork/Flashing
Energize Bldg/Commercial
Fill Cell
Final
Final
Final
Final
Final (Private Provider)
Final Building
Final Curtain Wall
Final Electrical
Final Gas
Final Inspection
Final Mechanical
Final Plumbing
Fire Alarm Test Report
Fire Pump Test Report
Fire Safety Final
Fire TCO/PCO or SAT
Fire TCO/PCO or SAT
Fire TCO/PCO or SAT
Firewall/Sheetrock
Footing
Footings
Fore TCO/PCA or SAT
Foundation/Footing
Framing
Framing
Framing Only
Gas – Test/Rough
Gas Final
Gas Rough
Handicap Accesibility
Health Department System Final
Hood and Duct Final
Hood and Duct Rough
Insulation
Insulation
Insulation – Batt
Insulation Blown
Landscape
Landscape Final/Residential
Landscape TCO/PCO
Lath
Lath and Nailing
Lintel Beams
Lintel/Tie Beam/Fill Cell
Mechanical – Rough in
Mechanical Final
Mechanical Rough
Mechanical Slab
Meter Can
Mobile Home Blocking and Tie
Mobile Home Final
Mobile Home Plumbing
Monolithic Footing/Slab
Municipal Sewer
Open Floor Framing
Partial Brick Flashing
Partial Column/Beam
Partial Curtain Wall
Partial Firewall
Partial Foundation
Partial Framing
Partial Framing
Partial Insulation
Partial Insulation
Partial Lath
Partial Lintel
Partial Mechanical
Partial Rated Wall
Partial Roof Sheathing
Partial Roof Ties
Partial Rough
Partial Rough
Partial Slab
Partial Slab
Partial Top Out
Partial Underslab
Partial Underslab
Pictures on File
Plumbing – Rough In
Plumbing Final
Pool Deck
Pool Final “Above Ground”
Pool Final “In Ground”
Pool Steel and Bonding
Pool Steel and Bonding
Pre Demolition Safety
Preliminary Building Final
Pressure Testing
Pump Pole
Rated Wall
Re Pipe
Re Roof
Roof Decks and Ties
Roof Final
Roof In Progress
Roof Sheathing
Roof Sheathing - Commercial
Roof Sheathing Only Partial Wall
Roof Wall Sheathing - Residential
Rough
Rough
Rough (Overhead)
Rough Electrical
Rough Plumbing
Service Change
Service For Sign
Sewer/Water Service
Shearwall/Interior
Sheathing Exterior
Slab
Slab On Grade
Slab or Floor
Stem Wall over 48” in Height
Swimming Pool Grounding
Swimming Pool Steel
Temporary Construction Power T Pole
Temporary Final (Commercial Only)
Temporary Final (Commercial Only)
Temporary Final (Commercial Only)
Temporary Pole
Threshold Inspection Report
Tie Beam
Top Out
Top Out
Tree Barricade
Under Slab
Underground Service Cover Up
Underground/Slab Rough
Underslab
Wall Sheathing
Wall Sheathing - Commercial
Wall Sheathing/Exterior
Water and Sewer
Window & Door/Exterior
Windows/Doors/Flashing
Wood Floor Framing
back to top
 
 
 

Home    |   About     |   Services    |   Inspection Manager     |   Contact     |   Login

2006 GENCO - All Rights Reserved
Powered by Vision Networks